Tel: +30 210 88.40.853|info@thermola.gr

konstantinos

Home|Konstantinos Fortes

About Konstantinos Fortes

This author has not yet filled in any details.
So far Konstantinos Fortes has created 6 blog entries.

Project delivery with a dual fuel burner (gas-heavy oil)

When an installation works 24/7, without interruption, with two fuels, the request is one: reliability. We recently installed the dual fuel burner (gas-heavy oil) KN350 from FBR that combines technology and durability. With a Lamtec programmer, 44 adjustment points and materials of uncompromising quality, it adapts precisely to each load and each fuel. **And

Project delivery with a dual fuel burner (gas-heavy oil)2025-10-09T18:14:41+03:00

Climatherm Energy 2024

Exciting moments at the recent Climatherm Energy 2024 exhibition where we presented three innovative products! Radiant R1KG High Power Condensing Boiler (180-240 kW): We are excited to present Radiant's latest innovation, a condensing boiler pre-assembled as a 3- or 4-boiler cascade. Combining the robust construction with the small size, it changes the heating game!

Climatherm Energy 20242025-10-09T18:16:35+03:00

Climatherm 2022 participation

Thermola S.A. would like to thank allt he visitors of Climatherm 2022 exhibition where: The Combi-Tech, Dual-Tech and One-Tech innovations applied to the Italian wall-mounted Radiant gas boilers were presented. Introduction and presentation of the unique technical characteristics of the new gas absortion pump of the Italian factory Robur. presentation of modern combustion systems

Climatherm 2022 participation2022-05-09T10:32:55+03:00